|
|
|
|
|
|
|
|
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (3)
- (1)
- (1)
- (1)
- (1)
- (1)
- (4)
- (3)
|
|
|
|
|
Build Your Online Product Catalogs?
Product Name: |
PVB Interlayer Boiling Device
|
Supply Ability: |
|
Related proudcts |
|
Specifications |
YC-04 |
Price Term: |
FOB, CNF, CIF |
Port of loading: |
Tianjin |
Minimum Order |
1 Set |
Unit Price: |
USD595 |
|
Function: ***ermining the effect of exposure of safety glazing materials to temperature and humidity condition by boiling.
Related Standard:
EN ISO 12543 每 4 Glass in building -Laminated glass and laminated safety glass 每 Part 4: Test methods for durability 每 Clause 5 High-temperature test AS/NZS 2208 Safety glazing materials in buildings 每 Appendix F Boil Test ANSI Z97.1 Safety Glazing Materials Used in Buildings 每 Safety Performance Specifications and Methods of Test 每 Clause 5.3.2 每 ( 1 ) Boil Test Technical Data:
Outside Size: 500mm*300mm*580mm
Inner Size: 395mm*260mm*495mm
Working Voltage and Frequency : AC220V/50HZ
Power: 3KW
Apparatus: The apparatus include two water baths and one temperature control device, each water baths is of sufficient size to hold the test specimen fully immersed vertically on edge for the duration test.
Principle: Specimens are immerse in hot water and boiling water for specified period of time and inspect bubbles and other defects
Working Environment:
Temperature: 20℃㊣5℃
Atmospheric Pressure: 8.60℅104Pa-1.06℅105Pa
Relative Humidity: 40%-80%
Instructions:
1, Place the boil test equipment stably, and put the sample holder into the box;
2, Pour water into box, control the water level is about 50-80mm from the top of the box, cover the box;
3, Switch on the power supply, set the temperature-controlled meter to required temperature (63~69℃).
4, When the temperature reach the required temperature (63~69℃), place the samples vertically on the sample holder inside the box,3 minutes later, take out the samples and quickly put them into another boiling test box, after 2 hours, take out the samples and observe.
5, Disconnect the power supply, drain the water after cooling.
Matters needing attentionㄩ
1, check whether the box is deformed or damaged before use.
2, check the water level in the box before switching on the power supply.
3, keep the box dry and maintain regularly when it is not used for a long |
Company: |
Qinhuangdao Yuanchen Hardware Co.,Ltd.
|
Contact: |
Mr. magoo liu |
Address: |
Northern Industrial Zone, Haigang District |
Postcode: |
066000 |
Tel: |
86-0335-3899615 |
Fax: |
86-0335-7963262 |
E-mail: |
|
|
|